Pullen Aquatic Center Renovation

Andrew Osterlund Architect was the principle architect on this project.  The alteration included construction documents, specifications, and construction administration throughout the project.  The project consisted of designing  two new sectional doors through existing masonry walls. Limited exterior site work to support maintenance equipment with the addition of a concrete pad. Adjusted lighting fixtures and sprinkler heads to match a modified ceiling height.

 

  • Location: Raleigh, NC
  • Date: Completed in June, 2013
  • Size: Interior: 255 square feet // Exterior: 40 square feet
  • Team: Andy
  • Engineer: Ross Linden Engineers
  • GC: Mastercraft Construction